Kiln Full and ready to go (almost)

This first image is how I left the kiln when I left Uni on Friday, it is quite obviously half filled and took me two days to get to that point. I got in this morning and started weighing out all 5 kilograms of ingredients, then I had to wait for the technician to bring the 300 grams of titanium dioxide. Once I had the titanium the scales had gone walkies so I emptied the bisque kiln and brushed oxides on to all my work. After lunch I finished making the glaze, fully sieved and all.

This second image was taken about 3.10 which is cutting it fine as my bus comes at 3.20, all but the top shelf on the right is full but the technician said he would fine a few pieces and put them in for the firing that would happen either Wednesday(today) or Thursday. I wouldn't have finished if Anthea hadn't have helped out for the last hour. Everything is done now and I am happy, three days to load a kiln is too much for me, I think I will just fill the small gas kiln on a weekly basis so I don't have to spend so long away from the wheel. I have learnt a lot doing so much glazing in one go and of course this is the second kiln I have ever packed for glazing, and definitely the first glaze kiln with more than one stack of shelves

I am just hoping all 9 of the first years that are supposed to be throwing don't show up so then I can have a wheel on Thursday

08/03/2010

Half full or half empty (if you don't intend to fire)

Well it is the start of another week, above is one of the very few images from this last week,  I trimmed the base on the wheel last Friday just to give it a little extra lift and removed some of my finger prints from lifting it off the wheel in the first place.

On Friday I also made some aggregate test pieces which once fired will have to be ground down to a smooth surface, I have done it before but it will be a very wet job.  I also filled the kiln some more and now it is half done, unfortunately I ran out of glaze and didn't get chance to to mix any more up, especially as the University is out of titanium and is waiting for a delivery so hopefully it will be there tomorrow so I can fill up the kiln.

I really miss throwing after spending so much time filling the kiln so hopefully I will be able to throw one piece at least tomorrow.

05/03/2010

Slow Loading



Spent all day glazing and loading the kiln as I went along, found out once I had done it all it is better to stagger the shelves so I will be going back in today making a few alterations and then filling some more of the space. But I have been doing everything, and it is a first time for me, the tech explained it and left me to it. Even been using bat wash on the bats.

Still got plenty of work to load into the kiln, my big mugs, some huge bowls and all my platters.Unfortunately because I was so busy I didn't manage to talk to Kevin Millward about easier techniques for throwing my platters. But this kiln takes priority at the moment as there is so much work to do with it, for the next firing I'm going to do it every week and I should have enough for the degree show, just need to pick up the pace a little and hope my little one doesn't get ill.

So many plans and it all relies on getting my own gas kiln, so I will be working hard to produce. One of the girls I work with told me to be more selective and only pick a quarter as many but she is making things that cost at least £80 a go and I just don't have that sort of work.